PROJECTS

Pipeline Riser Repair  (UBIT  GB-GP)                                                                Project Masters/ExxonMobil – 2010

Cluster 31 WellHead Maintenance Services  (SPDC)                                      SPDC – 2011

Pigging & Auxiliary Pumping 12 (Oguta-Egbema)                                          DSV/SPDC

Progressive/Intelligent Pigging (Isimiri-Imo Gate M/F)                              TDW/SPDC

Precommissioning of 24” line (Itoki-Papalanto)                                            Mopol/NGC

Asset Verification of Top Deck Piping (Trinity Spirit FPSO)                       SEPCOL

Precommissioning of PanOcean Gas Plant (Ovade-Ogharefe)                   PESO/Panocean

Asset Verification/ Pig Trap Modification (Andoni)                                    Green Energy

Slimbore Intelligent Pigging (Forcados Estuary)                                         Calaya/SPDC

Facility Revamp/Blasting, Repair & Painting                                              (Nembe)  SPDC

Pigging/Effluent Re-injection (Odeama-Belema)                                      DSV/SPDC

Asset integrity verification                                                                             ORIENTAL ENERGY

Pigging/auxiliary pumping (10” Egbema-Asa)                                          Topline/SPDC

Intelligent Pigging (10” Odeama-Belema)                                                  DSV/SPDC

Cathodic Protection 24” line                                                                         OILSERV

Hydrotest of 6” line (VZTX-Gbaram CPF)                                                Morpol/SPDC

Pig Trap Repair/Valve Rocking (Alakri)                                                   SPDC

Inspection Evaluation Diagnosis                                                               NAOC

EPCIC-Gas Supply Infrastructure                                                             Ronsheng/NGMC