Pipeline Riser Repair (UBIT GB-GP) Project Masters/ExxonMobil – 2010
Cluster 31 WellHead Maintenance Services (SPDC) SPDC – 2011
Pigging & Auxiliary Pumping 12 (Oguta-Egbema) DSV/SPDC
Progressive/Intelligent Pigging (Isimiri-Imo Gate M/F) TDW/SPDC
Precommissioning of 24” line (Itoki-Papalanto) Mopol/NGC
Asset Verification of Top Deck Piping (Trinity Spirit FPSO) SEPCOL
Precommissioning of PanOcean Gas Plant (Ovade-Ogharefe) PESO/Panocean
Asset Verification/ Pig Trap Modification (Andoni) Green Energy
Slimbore Intelligent Pigging (Forcados Estuary) Calaya/SPDC
Facility Revamp/Blasting, Repair & Painting (Nembe) SPDC
Pigging/Effluent Re-injection (Odeama-Belema) DSV/SPDC
Asset integrity verification ORIENTAL ENERGY
Pigging/auxiliary pumping (10” Egbema-Asa) Topline/SPDC
Intelligent Pigging (10” Odeama-Belema) DSV/SPDC
Cathodic Protection 24” line OILSERV
Hydrotest of 6” line (VZTX-Gbaram CPF) Morpol/SPDC
Pig Trap Repair/Valve Rocking (Alakri) SPDC
Inspection Evaluation Diagnosis NAOC
EPCIC-Gas Supply Infrastructure Ronsheng/NGMC